Skip to content

Cut into the floor. Not through your renovation.

Underfloor heating used to mean lifting your entire floor, digging out the old screed down to the subfloor, laying new pipework, then pouring fresh screed over it before re-tiling everything: weeks of work and a house that's a building site the whole time. Our milling method skips almost all of that by cutting directly into the floor you already have, no need to dig it all up.

existing floormilled channel + pipeheat rises evenly

Milled vs. traditional underfloor heating

Traditional retrofit underfloor heating means digging out your existing screed and tiles across the whole floor, laying pipe on top of the sub-floor, then rebuilding the floor from scratch. Milling skips almost all of that by cutting the pipe route directly into the floor you already have, and we offer two ways to do it: keep your exact floor height, or skip tile removal entirely. The table below breaks down the difference.

Milled, height unchangedMilled, tile over the topTraditional retrofit
Existing floorAll tile lifted; screed milled along the pipe route onlyStays down; milled straight throughFully removed, screed dug out across the whole room
Typical timelineA few daysA few days5–6 weeks
Floor heightUnchanged; pipe sits inside the existing screedRises slightly, across the whole roomRaised by the new screed poured over the pipe
Re-tiling neededThe whole roomThe whole room, over the old tileThe whole room
Dust and messDust-extracted milling; house stays livableDust-extracted milling; house stays livableFull demolition and rebuild of the floor
Best suited toKeeping the exact floor height you have nowSkipping tile removal, often the faster or cheaper optionNew builds or a floor already being fully replaced
  1. A villa floor being assessed ahead of a milling job
    01

    Assess your floor

    We visit, check your current floor type and construction, measure the area, and talk through your heating goals. This is also when we scope timeline and give you a real quote, not a rough guess.

  2. Milling machine cutting a channel into an existing tiled floor
    02

    Mill the slots

    Our milling machine cuts narrow, precise channels directly into your existing screed or concrete floor, following the pipe layout for the room. A high-powered dust extractor runs with the machine the whole time, so this stays a clean job, not a demolition site.

  3. Manifold and actuators being adjusted as part of pressure testing
    03

    Lay and test the pipework

    Water-based heating pipe goes into the milled slots in one continuous run, with no joints hidden under the floor. Before anything gets sealed, the full system is pressure-tested to confirm there are no leaks. This step doesn't get skipped.

  4. Screed being finished level over freshly laid heating pipe
    04

    Seal, level, and retile

    Once tested, the slots are sealed and skimmed level. From here it depends which method we used: lift and mill into the screed beneath your existing tile, and the whole room gets retiled fresh at exactly the same height as before. Mill straight through your existing tile instead, and new tile goes down across the whole room on top, which raises the floor slightly but skips tile removal entirely. Either way, the milling itself only ever touches a narrow channel, not your whole floor structurally.

  5. An air source heat pump installed outside a villa, connected and ready to commission
    05

    Connect and commission

    The system connects to your heat source, existing or new, most often an air source heat pump, and gets commissioned and handed over, working.

Ready to see if your floor's a fit?

Get Your Free Quote