Skip to content

The work, not the pitch.

Every photo here is from a real Algarve job, not a render and not a stock shot. The milling machine mid-cut with the dust extractor running, pipe fanning out from a manifold before the screed goes down, colour-coded valves getting tuned room by room, and the finished floor once the tile's back on.

Villas in Lagos, apartments in Albufeira, a rustic place with exposed beams near Silves; same method, different floor every time. More gets added here as jobs across the Algarve wrap up.

Red heating pipe laid across a floor with insulation board covering part of the room

More photos

Follow the work on Instagram.

New jobs, in-progress shots, and finished floors, posted as work wraps up across the Algarve.

@algarveunderfloorheating

Want your floor to look like this?

Get Your Free Quote