The work, not the pitch.
Every photo here is from a real Algarve job, not a render and not a stock shot. The milling machine mid-cut with the dust extractor running, pipe fanning out from a manifold before the screed goes down, colour-coded valves getting tuned room by room, and the finished floor once the tile's back on.
Villas in Lagos, apartments in Albufeira, a rustic place with exposed beams near Silves; same method, different floor every time. More gets added here as jobs across the Algarve wrap up.
















More photos
Follow the work on Instagram.
New jobs, in-progress shots, and finished floors, posted as work wraps up across the Algarve.
